Quantity Surveying Courses in Dubai
A quantity surveyor oversees all financial aspects of construction projects, from initial calculations to final accounting. They aim to minimize costs, maximize value, and ensure compliance with regulatory standards.
Whether employed by the client or the contractor, quantity surveyors work both in offices and on-site, involved in projects from inception to completion. They prepare estimates, monitor expenses, and manage any contract changes that impact costs, providing profitability reports along the way.
MODULE: I – BASIC –QS
11. WHO ARE “ QUANTITY SURVEYORS “ or WHAT IS “QUANTITY SURVEYING” ?
22. CONSTRUCTION PROJECT & ORGANIZATION STRUCTURE – POSITION OF QS.
33. INTRODUCTION TO BASIC CONCEPTS OF
- UOM ( UNITS OF MEASUREMENTS ) & DIMENSIONS – LINEAR , AREAL &VOLUMES - RULES.
- WHAT IS A QUANITY ESTIMATE – LEVELS & LINES - PRACTICAL APPLICATIONS.
- DATA REQUIRED TO PREPARE AN ESTIMATE.
- DIFFERENCE BETWEEN DETAILED ESTIMATE & ABSTRACT COST ESTIMATE – SOLVED EXAMPLES.
- BUDGET CALCULATIONS
- TIME CALCULATIONS.
- WHAT IS A CONTRACT ?
44. DIFFERENT KINDS OF CIVIL ENGINEERING PROJECTS / STRUCTURES
- BUILDING PROJECTS – INDIVIDUAL HOUSES , APARTMENTS , COMMERCIAL MALLS , TOWNSHIPS ETC.,
- ROAD PROJECTS – ASPHALT & CONCRETE PAVEMENTS.
- OIL& GAS PROJECTS
- INDUCTRIAL PROJECTS
- IRRIGATION DAMS
- BRIDGES
- CULVERTS
55. HOW TO READ THE – “ENGINEERING DRAWINGS& DETAILS “ ?
- PLANS
- ELEVATIONS
- SECTIONS
66. HOW TO READ THE PTS – PROJECT TECHNICAL SPECIFICATIONS / CONTRACT SPECIFICATIONS.
7METHODS OF TAKING OUT QUANTITIES
- LONG – WALL & SHORT – WALL METHOD
- CENTRE-LINE METHOD
- PLINTH AREA METHOD
- CUBICAL CONTENTS METHODS
- SERVICE UNIT METHOD.
88. QUANTITY CALCULATIONS / TAKE-OFF’S - STRUCTURAL & ARCHITECTURAL ITEMS
- EARTHWORKS - SURVEYING - EXCAVATION/ CUTTING, FILLING & BACK-FILLING WORKS – ROADS & BUILDINGS
- ANTI-TERMITE , POLYTHENE SHEET ,WATER-PROOFING MEMBRANE & SCREED CONCRETE.
- CONCRETE WORKS –FOUNDATIONS (ISOLATED ,STEPPED ,RAFTS ,PILES AND PILE-CAPS ,ROCK-ANCHOR ETC., ), RETAINING WALLS, DPC, COLUMNS , BEAMS , SLABS ,LINTELS, WATER TANKs , SEPTIK TANK , ETC.,
- SHUTTERING& FORM WORKS
- STEEL - PREPARATION OF “BBS – BAR BENDING SCHEDULES “ & QUANTITY TAKE-OFF’S
- PLINTH BEAMS, COLUMNS, SLAB BEAMS, SLABS, ETC.
- BRICK WORK CALCULATION– ROOMS , COMPOUND WALLS ETC.,
- FINISHING WORKS – TILES – FLOORING & CLADDING, PLASTER (IN AND OUT),STRUCTURAL GLAZING & ALUMINIUM FRAMES, PAINTING, WOOD WORKS CALCULATION ETC.
- INTERIOR DECORATING WORKS
99. BASIC MEP – (MECHANICAL, ELECTRICAL AND PLUMBING) :
- WATER SUPPLY
- STORM WATER
- DRAINAGE
- FIRE-FIGHTING
- ELECTRICAL
- AIR-CONDITIONING
1010. HOW TO PREPARE A B.O.Q (BILL OF QUANITITIES) & B.O.M (BILL OF MAYTERIALS) – COMPUTER AIDED.
1111. WHAT IS RATE ANALYSIS & SCHEDULE OF RATES | HOW TO CALCULATE RATE - ANALYSIS FOR ALL CONSTRUCTION ACTIVITIES ?
1212. DETAILED ESTIMATION, PREPARATION OF B.O.Q (WORKS)&B.O.M – COMPUTER AIDED.
1313. TYPES OF CONTRACTS –
- LUMPSUM CONTRACT
- ITEM RATE CONTRACT
- COST-PLUS CONTRACT
- EPC CONTRACT
1414. WHAT IS TENDERING AND HOW TENDERING PROCESS HAPPENS
- PRE-BID PREPARATIONS
- WHAT ARE TENDER DOCUMENTS / CONTRACT DOCUMENTS.
- CALLING FOR TENDERS
- FINALIZING L1, L2 & L3 - NEGOTIATION TECHNIQUES
- AWARDING OF CONTRACT – KICK-OFF MEETING
1515. ROLES & REPONSIBILITIES OF ESTIMATOR &QUANTITY SURVEYOR.
1616. MATERIAL PROCUREMENT – PURCHASE ORDERS & WORK ORDERS – RECEIPT AT STORES .
1717. WEEKLY / MONTHLY BILL PREPARATION & RETENTIONPERCENTAGE
1818. SUB-CONTRACTING – QUOTATIONS & INVOICE CLEARING
1919. WORK ORDER PREPARATION STEPS.
2020. WHAT IS CASH FLOW?
- WEEKLY CASH FLOW
- MONTHLY CASH FLOW
2121. M-BOOK & RECORDING MEASUREMENTS.
2222. CO-ORDINATION WITH QA/QC FOR SIGNED INSPECTION REQUESTS.
2323. BILL PREPARATION, HOW TO CHECK THE BILLS, BILL CERTIFICATIONS & HOW TO CLOSE A BILL
2424. ROLE OF QUANTITY SURVEYOR IN POST CONSTRUCTION WORKS.
2525. MAKE VARIATION ORDERS – RECORDING OF WORKS.
2626. DOCUMENTATION BACK-UPS ( SOFT COPIES & HARD COPIES )
2727. VALUATION OF PROPERTIES.
2828. FIXING OF RENTS
29MODULE: II – ADVANCED –QS A. PRE – CONTRACT / TENDERING ( BEFORE CONTRACT IS AWARDED ) B. POST– CONTRACT / TENDERING ( AFTER CONTRACT IS AWARDED )
Benefits of learning Quantity Surveying at Solve Tech Training Institute
- Our experienced professionals are instructing this course.
- Solve Tech provides you the facility to schedule the classes according to your availability.
- Following each session, you'll receive the course material for your own future reference.
- You will receive an internationally recognised certification after completing the course.